Tyseley Energy Recovery Facility
This state-of-the-art energy recovery facility takes around 350,000 tonnes of waste per year and burns it to produce electricity. ESH were contracted to design, supply and install a high temperature trace heating system to temperature maintain a large fly ash hopper at +110°C. The steel hopper was 2m tall and 2.3m squared.
.
No comments:
Post a Comment