Friday, 30 November 2012

Tyseley Energy Recovery Facility

This state-of-the-art energy recovery facility takes around 350,000 tonnes of waste per year and burns it to produce electricity. ESH were contracted to design, supply and install a high temperature trace heating system to temperature maintain a large fly ash hopper at +110°C. The steel hopper was 2m tall and 2.3m squared.

.

Wolverhampton New Cross Hospital

Within the hospitals new £16m Integrated Pathology Building, ESH were contracted to provided a frost protection trace heating system to the chilled water and heating pipework on the level 1 plant deck and roof area. Over 300 metres of constant wattage heating cable was supplied and installed.

Monday, 19 November 2012

McDonalds, Bognor Regis

Within this brand new McDonalds restaurant, ESH supplied and installed a hot water temperature maintenance system to maintain +55°C on all the restaurants DHWS pipework. The system was designed using type H2OWAT55 self regulating heating tape.

Ashdown Technical College, Poole

For this brand new technical college, ESH designed, supplied and installed a frost protection trace heating system to protect two runs of 90m long, 32mm diameter, MDPE pipework. The pipes run from the MFL building towards the kitchen building.

Friday, 16 November 2012

Regents Place, North East Quadrant, London



Regent's Place is a 13-acre fully managed estate in London's West End. This large scale trace heating project saw ESH design, supply and install trace heating to provide frost protection to external 150mm steel pipework. The project required over 550m of type VCBOJ8/2 constant wattage heating tape to complete.


Tuesday, 13 November 2012

Newport Central Library

Constant wattage trace heating cable type VCBOJ12/2 was supplied and installed to provide frost protection to the chilled water pipework.

Monday, 12 November 2012

Plot 2600, Oxford Business Park

ESH designed, supplied and installed a trace heating system to provided frost protection to the chilled water pipework. All pipework was situated on the roof and ran from the east plantroom, the west plantroom and the roof plantroom.

Friday, 9 November 2012

Birchwood Shopping Centre, Warrington

For this small local shopping centre, ESH designed, supplied and installed type VCBOJ12 constant wattage heating tape to provide frost protection to external chilled water pipework.

Friday, 2 November 2012

Greenwich Reach, London


Greenwich Reach is waterside development comprising of luxury apartments, a hotel and office workspace. Here ESH provided frost protection to the 125mm metal pipework in the basement area and within blocks A, B & E. Well over 300 metres of type VCB constant wattage heating tape was supplied and installed on site.