Tuesday, 25 September 2012

Good Hope Hospital, Birmingham


After supplying an installing trace heating system for temperature maintenance on both the endoscopy and ultrasound roofs in 2004, ESH were back at Good Hope Hospital to install a frost protection system to 200 metres of chilled water pipework above the emergency department.   

No comments:

Post a Comment