The Isle Of Sheppey Academy
For this large redeveloped Academy, ESH designed, supplied and installed a trace heating system to perform the following duties:
To temperature maintain +55
°
C on the HWS pipework in two science rooms
Provide frost protection trace heating to the external BCWS pipework and also the schools sprinkler pipework