Monday, 20 August 2012

The Isle Of Sheppey Academy

For this large redeveloped Academy, ESH designed, supplied and installed a trace heating system to perform the following duties:

  • To temperature maintain +55°C on the HWS pipework in two science rooms
  • Provide frost protection trace heating to the external BCWS pipework and also the schools sprinkler pipework

No comments:

Post a Comment