Thursday, 30 August 2012
Aztec West, Bristol
This luxury hotel in Bristol required a trace heating system to provide temperature maintenance to the domestic hot water services in order to maintain +55°C. ESH supplied and installed type H2OWAT55 self regulating heating cable throughout this project.
Monday, 20 August 2012
The Isle Of Sheppey Academy
For this large redeveloped Academy, ESH designed, supplied and installed a trace heating system to perform the following duties:


- To temperature maintain +55°C on the HWS pipework in two science rooms
- Provide frost protection trace heating to the external BCWS pipework and also the schools sprinkler pipework
Thursday, 16 August 2012
Heatlands Academy, Birmingham
Designed, supplied and installed a frost protection trace heating system for the external chilled water and mains cold water pipework.
Monday, 13 August 2012
Dewstow Primary School, Gwent
Ashchurch View Care Home
ESH were contracted to supply and install a trace heating and thermal insulation system to provide frost protection to copper and plastic pipework associated with a large sprinkler tank.
Friday, 10 August 2012
Bedford Energy Centre
For this renewable energy plant, ESH supplied and installed a trace heating system to provide frost protection to 150mm chilled water pipework, all mounted on the roof area.
Tuesday, 7 August 2012
St Barts Hospital, London
Provided frost protection to the chilled water pipework mounted externally on the 7th floor chiller compound. ESH supplied and installed type VC constant wattage heating cable throughout.
Friday, 3 August 2012
Dudley Evolve Building, Dudley College