Monday, 18 June 2012

Greencore Grocery, Evercreech

For this leading international manufacturer of convenience foods, ESH designed, supplied and installed a frost protection system to over 150 metres of metal pipework containing boosted cold water. Type VC constant wattage heating cable was installed throughout.

No comments:

Post a Comment