Tuesday, 19 June 2012

Mizkan Europe Ltd, Burntwood

Mizkan is one of the largest producers of vinegar in the Europe. Here at their UK manufacturing plant, ESH designed, supplied and installed a trace heating system to temperature maintain 2" and 3" glucose pipework at 55°C. 



Monday, 18 June 2012

Greencore Grocery, Evercreech

For this leading international manufacturer of convenience foods, ESH designed, supplied and installed a frost protection system to over 150 metres of metal pipework containing boosted cold water. Type VC constant wattage heating cable was installed throughout.

Waterloo Rail Station, London


Part of Waterloo's retail balcony development, ESH were contracted to design, supply and install a trace heating system to frost protect the CHW, CWM & secondary cooling water pipework on the roof area. Constant wattage heating cable was used throughout this project.

Monday, 11 June 2012

Primark (Cascade Shopping Centre), Portsmouth

Type ESRS self regulating heating cable was supplied and installed, by ESH, to frost protect the cold water plastic pipework within this new Primark store.

Wednesday, 6 June 2012

Turpas Refinery

ESH designed, supplied and installed over 400 metres of Hazardous Area trace heating cable as well as removable insulated heating jackets to pipework skids, prior to shipping from the UK to Turkey.