Monday, 28 May 2012
Coca-Cola Enterprises, Wakefield
Designed, supplied and installed a trace heating system to provide frost protection to a run of external copper pipework.
Monday, 14 May 2012
Ashdown Technical College, Poole
For this our first project down at the Ashdown College, ESH designed, supplied and installed two separate trace heating system to provide the following:
- Frost protection to the cold water pipework in the first floor plantroom
- To temperature maintain the DHWS pipework throughout two levels
Perrigo, Wrafton Laboratories
The project scope was to supply and install a trace heating system to provide temperature maintenance on two large metal tanks. The tanks were 3.1 metres in diameter and 4 metres tall and required to be maintain at +40°C.
Friday, 11 May 2012
Pathology Block, Bangor University
ESH designed, supplied and installed a trace heating system to provide frost protection to both the chilled water and hot water pipework.
Tate Modern Gallery, London
The Tate is the most-visited modern art gallery in the world and ESH were proud to have been involved in the brand new TM2 extension.
ESH were contracted to design, supply and install a hot water temperature maintenance system to the HWS pipework at +55°C. Type H2OWAT55 self regulating heating cable was installed throughout this project.
ESH were contracted to design, supply and install a hot water temperature maintenance system to the HWS pipework at +55°C. Type H2OWAT55 self regulating heating cable was installed throughout this project.
Tuesday, 8 May 2012
Ruskin Hall (Ruskin College), Oxford
During the redevelopment of Ruskin College, ESH supplied and installed a H2OWAT55 self regulating trace heating system to the HWS pipework to provide hot water temperature maintenance at +55°C.
Subscribe to:
Comments (Atom)

