Welcome to ESH Trace Heating Ltd's project list for 2012.
Friday, 10 February 2012
Bristol International Airport
ESH supplied and installed a trace heating system to the DHWS pipework in order to temperature maintain +55°C. The system was designed to provide Legionella disinfection in conjunction with a controller type HWAT-ECO.
No comments:
Post a Comment