To supply and install a frost protection trace heating system to over 200 metres of plastic pipework up to 25mm in diameter. This comprised of 140m of rainwater pipe and 70m of spring water/CWS pipe.
Monday, 27 February 2012
Monday, 20 February 2012
Flint Ink, Wolverhampton
Designed and supplied materials and labour to install and commission a trace heating system for large steal tanks and the connecting pipework. ESH installed over 660 metres of constant wattage heating tape in total.
Friday, 17 February 2012
Kings Cross Freight Depot, London
Tuesday, 14 February 2012
Sandvik Medical Supplies, Sheffield
Supplied and installed type FBT self regulating heating cable to provide a frost protection system to the external water services pipework.
Friday, 10 February 2012
Bristol International Airport
ESH supplied and installed a trace heating system to the DHWS pipework in order to temperature maintain +55°C. The system was designed to provide Legionella disinfection in conjunction with a controller type HWAT-ECO.
Friday, 3 February 2012
Royal Academy of Engineering, London
The Manor Hospital, Oxford
ESH were contracted to design, supply and install a frost protection trace heating system to the roof mounted cold water pipework.
Thursday, 2 February 2012
HM Prison, Featherstone
Thankfully a short sentence for our installation guys who installed a hot water temperature maintenance trace heating system to the ceiling mounted wash pipework. The system, which ran from the plant room to the kitchen area, required maintaining at +55°C. ESH designed, supplied and installed the full system using type H2OWAT55 self regulating heating cable.
Wednesday, 1 February 2012
Coventry University
ESH designed, supplied materials and labour to install a frost protection trace heating system to the university's external CHW pipework. In total the system required over 530 metres of type ESRS self regulating heating tape to complete.