Kettering General Hospital

The hospital required over 150 metres of chilled and cold water pipework frost protected. The pipework which ran from the pump station to both a chiller and air handling unit, was installed with type VC constant wattage heating cable to maintain the pipework at +5°C. ESH designed, supplied materials and installed the system.