Hartshill Medical Centre, Stoke-On-Trent

ESH designed, supplied and installed a frost protection system to the mains cold water pipework within the ceiling void area. The system designed utilised our type VCB constant wattage cable which was straight traced underneath the pipework.

Friday, 26 October 2012

BMW (UK) Manufacturing Ltd, Oxford

Within this large car manufacturing plant, ESH were contracted to design, supply and install three separate frost protection trace heating systems to the following pipework:

  • Weld water external pipework
  • MCWS external pipework
  • HRW external pipework

Holbeach STW

Designed, supplied and installed a frost protection trace heating system to external metal pipework up to 200mm NB.

Stepney Green School, London

Within this brand new secondary school situated in the heart of East End of London, ESH supplied and installed a frost protection trace heating system to the domestic hot water, hot water (return pipe) and cold water pipes. The system was designed using our type FBT self regulating heating cable which was used throughout.


Wednesday, 24 October 2012

Helius Corde Ltd, Moray

A specialised trace heating project for the biomass energy development company Helius Corde. ESH were contracted to design, supply and installed a trace heating system to provide the following:

  • Frost protection to the PDL, PA and PC external water pipework
  • Process temperature maintenance to the caustic soda and syrup internal pipework

In total this project required over 1km of constant wattage trace heating cable.

Thursday, 18 October 2012

The Law Building, Cardiff University

For this project ESH supplied and installed a trace heating system to provide frost protection to roof mounted heating pipework.

Thursday, 11 October 2012

Sytner BMW Showroom, Leicester

Within this brand new BMW showroom, ESH were contracted to provided a frost protection trace heating system to external CHW pipework. Type ESRS self regulating heating cable was supplied and installed.

Friday, 5 October 2012

The Old Gaol, Oxford


Built in 1811, The Old Gaol is now a Grade 2 listed building. Part of the re-development to transform into luxury apartments, duplexes and cottages saw ESH design, supply and install a frost protection system to the BCWS and MCW pipework.

In total just under 1km of type VC constant wattage trace heating cable was supplied and installed on site.