Monday, 23 April 2012

Doncaster Civic Offices



Within this fabulous looking civic office, ESH designed, supplied, installed and commission a Water Leak Detection System to protect critical areas within the building from the risk of water damage.



Friday, 20 April 2012

Hi-Line Services Ltd, Lichfield

For this project we supplied and installed a trace heating system to temperature maintain a stainless steel vessel containing glucose at +50°C. The tank, 4.7m tall and 3m in diameter, required over 240 metres of self regulating heating tape to hit the required temperatures.

Thursday, 19 April 2012

Schloss Strassen Center, Berlin



A rare trip overseas for the ESH installation team. Within this Berlin shopping centre, ESH designed, supplied and installed a trace heating system to provide frost protection to 200mm flow and return steel pipework. 


Tuesday, 17 April 2012

Samlesbury Aerodrome (BAE Systems), Blackburn

Owned by defence company BAE Systems, they use this site to manufacture several aircraft types. ESH were contracted to design, supply and install a frost protection trace heating system to protect external pipework.

Friday, 6 April 2012

Central Street, Islington

Central Street is a new mixed use development in Islington, London. Here ESH supplied and installed a frost protection system to the external metal pipework, this included repairs to the existing trace heating on the sprinkler pipework in the car park area.

Bishops Cleeve Bowling Club, Cheltenham

Here at this local bowling club, ESH supplied and installed both the trace heating and thermal insulation to provide a frost protection system to plastic pipework located within the roof space.

Elizabeth Garrett Anderson School, London

Type FBT self regulating heating cable was supplied and installed by ESH, to provide frost protection trace heating to external pipework

Tuesday, 3 April 2012

Unilever Research & Development Laboratory, Bromborough

This site is home to the multinational consumer goods company Unilever's main research and development facility in the UK. ESH were contracted to design, supply and install a frost protection trace heating system to external and internal unheated pipework. Type ESRS self regulating heating cable was used during this project.